Monument Road Bike Path – Civil
Monument Road Bike Path – Civil

This City of Grand Junction project includes construction of 8,000 LF of 10 Ft. wide, 6” thick concrete trail adjacent to Monument Road.  More than 1,600 CY of concrete will be required to complete the trail.  The project runs from D Road to the Lunch Loops trailhead.  It also includes a bridge, several box culvert crossings over No Thoroughfare Creek, as well as improvements to the Lunch Loops trailhead.