The Ridgway Reservoir Spillway Fish Screen project is composed of a series of concrete footings and buttresses surrounding the spillway structure of the Ridgway Reservoir. This foundation will support an elaborate screen structure that prevents fish and debris from entering the spillway. The Bureau of Reclamation project required very tight concrete tolerances to accommodate the prefabricated galvanized steel screen structure.
General Contractor: Kissner General Contractors, Inc. Cedaredge, CO